ohmojo bangalore metro sorted by
relevance

Admin12.04.2022

Bengaluru Metro: TBM Urja to start tunnelling stretch between Cantonment and Pottery Town

Metro services have occasionally operated beyond 2300 hours.
7706
Admin19.04.2022

BMRC will expand 170km network of Bangalore Metro by 2024: Anjum Parwez

On the first 3 days of operations of Reach-1, 169,019 people rode the metro.
Admin14.03.2022

Namma Metro

Initially, there were no toilets at Namma Metro stations.
3403
Admin12.03.2022

Bengaluru Metro: TBM Urja to start tunnelling stretch between Cantonment and Pottery Town

So in the train as it was a general compartment me and my neighbor had to share the upper berth.
3300
Admin12.04.2022

Bids Invited for Bangalore Metro Challaghatta Depot's Work

All Phase I underground stations were 272 meters long and 24 meters wide, except for Chickpet and K.
9104
Admin18.03.2022

Bengaluru Metro: TBM Urja to start tunnelling stretch between Cantonment and Pottery Town

I told her to remove clothes.
65010
Admin27.03.2022

Bengaluru Metro: TBM Urja to start tunnelling stretch between Cantonment and Pottery Town

With the workers completing the more complex part of the project, the construction firm hopes to complete the project by the end of 2022.
1001
Admin05.03.2022

Bids Invited for Bangalore Metro Challaghatta Depot's Work

The second new line will be 21.
Admin07.04.2022

Bangalore Metro Phase 3 to cover 42 km, have 31 stations

The stretch includes the Baiyappanahalli, Swami Vivekananda Road, Indiranagar, Halasuru and Trinity metro stations.
3701
Admin23.04.2022

Phase

The difficult geological conditions below ground with a mix of soft soil, high groundwater levels, hard granite and large boulders was a major impediment for tunnel boring.
4803
Admin14.04.2022

Metro airport line 49 properties away

.
2708
Admin05.03.2022

Bangalore Metro: Map, Timings, Routes, Phase 2, Stations

The app is currently available for Android users.
6708